About 110 km on NE1 — under 2 hours drive time.
Expressway toll plazas increasingly host DC chargers for top-ups.
Plan now uses a vehicle preset, 90% start SOC, Wh/km from preset, and cost-aware ranking on longer corridors. Adjust on the planner page if needed.
May and June heat across India often adds 10–15% energy use on highways (AC, battery cooling). Bump reserve SOC and search threshold for this route.
Suggested planner settings: 25% reserve SOC · 35% search threshold
About 110 km on NE1 — under 2 hours drive time.
Expressway toll plazas increasingly host DC chargers for top-ups.
Good connector test before longer Mumbai → Ahmedabad legs.
Verify Gujarat operator apps before you plug in.